Returns, Refunds & Inspection Policy
Statutory framework governing custom precision fabrication returns, the mandatory 7-calendar-day inspection window, 100% refund of escrow funds, ISO 2768-mK metrology tolerances, and 3-stage cancellation splits under the Consumer Protection Act, 2019.
Inspection Window
7-Calendar-Day Window
Defect Guarantee
100% Escrow Refund
Metrology Standard
ISO 2768-mK & CMM
Pre-Dispatch Cancel
30% Sunk / 70% Refund
Scope of Bespoke & Custom Manufacturing Returns
Unlike standard consumer electronics or mass-manufactured retail goods, physical parts ordered through Wesker are bespoke, custom-fabricated components machined to customer-supplied CAD geometry (STEP, STL, DXF), 2D drawings, and specialized engineering tolerances.
Because custom parts carry zero secondary salvage value, returns are governed strictly by engineering defect verification, tolerance non-compliance under recognized standards (ISO 2768-mK for CNC machining, DIN 16901 for additive polymers), and material chemical composition verification.
Statutory Protection Under Consumer Protection (E-Commerce) Rules, 2020:
While bespoke products are exempt from arbitrary “change of mind” returns once custom fabrication has begun, buyers retain full, legally protected rights to refunds, priority remakes, or return freight indemnification whenever delivered parts fail drawing tolerances, utilize uncertified materials, arrive damaged, or fail verified quality benchmarks.
The Mandatory 7-Calendar-Day Inspection Window
Upon physical carrier delivery confirmed via the single-use 6-digit Delivery OTP, the Buyer enters a statutory 7-calendar-day inspection window. During this window, 100% of order consideration remains locked in the platform nodal escrow account.
Authorized Activities During the 7-Day Window
- Dimensional Metrology: Inspect critical features, hole centers, bore concentricity, and thread pitch using digital vernier calipers, micrometers, or Coordinate Measuring Machines (CMM) against your submitted 2D drawings.
- Surface Roughness (Ra): Verify surface roughness, bead-blast texture, and anodizing uniformities without altering the mechanical integrity of the parts.
- Fitment & Sub-Assembly: Non-destructive physical mating with mating sub-assemblies.
- One-Click Acceptance or Formal Dispute: If parts satisfy your requirements, confirm acceptance to release funds. If defects are found, lodge a formal dispute ticket via our Grievance Desk before the 7-day window elapses.
Grounds for 100% Refund of Escrow Funds or Free Priority Remake
Pursuant to statutory protections under the Consumer Protection (E-Commerce) Rules, 2020, a buyer is entitled to an immediate 100% refund of escrow funds or an expedited free priority remake under any of the following confirmed technical grounds:
Critical dimensions or hole center distances deviate beyond stated drawing tolerances (or exceed default ISO 2768-mK / standard manufacturing limits) as verified by calibrated metrology or photographic measurement evidence.
The fabricator used incorrect material stock (e.g., standard commercial aluminum instead of specified aerospace 6061-T6, or standard PLA instead of heat-resistant PETG/Polycarbonate), verified via spark testing or Material Test Certificates (MTC).
Parts arrived cracked, bent, warped, corroded, or crushed due to sub-standard packaging, missing desiccants, or insufficient protective foam cushioning by the workshop.
The workshop failed to complete fabrication and ship within 5 business days past the confirmed dispatch deadline without formal mutual consent recorded on the platform.
Order Cancellation Matrix & 3-Stage Escrow Lifecycle
Because custom fabrication requires reserving machine hours, CAM toolpath generation, and unrecoverable raw stock cutting, cancellations are strictly governed by our 3-stage lifecycle:
Zero-Penalty Pre-Acceptance Cancellation
If you cancel prior to workshop confirmation and material commitment, 100% of the funds are immediately unlocked and refunded from nodal escrow back to your source account with 0% cancellation fee.
30% Sunk Platform & Maker Fee
Once the manufacturing workshop has confirmed the order and initiated production scheduling, material preparation, or machine programming, cancellation prior to dispatch results in exactly 30% of the gross order value being retained by Wesker and the Maker to cover machine slot reservation, CAM slicing engineering, material cutting, and administrative processing.
70% Reversible Escrow Credit
The remaining 70% of the milestone escrow balance is automatically unlocked and credited directly back to the Buyer's source payment method via our Cashfree nodal gateway (credited within 3–5 banking days).
Dispatched Consignments in Transit
Once the order has been handed over to a courier partner and assigned an active airway bill (AWB), 0% cancellation is permitted. The Buyer must accept physical delivery using the Delivery OTP and address any non-compliance via the 7-day technical inspection dispute window.
Engineering Metrology Standards & Tolerance Benchmarks
To avoid subjective disputes between engineers and workshops, defect claims are evaluated against objective international engineering standards:
| Manufacturing Process | Default Standard | Linear Tolerances | Inspection Protocol |
|---|---|---|---|
| CNC Milling & Turning | ISO 2768-mK (Medium) | ±0.05 mm to ±0.10 mm | Calibrated Digital Vernier / Micrometer / CMM Probe |
| Industrial 3D Printing (FDM) | DIN 16901 / Custom Spec | ±0.2 mm or ±0.5% of dimension | Optical Callipers / Surface Gauge |
| Resin SLA / SLS 3D Printing | High Precision Polymeric | ±0.1 mm | Laser Profilometry / Digital Gauge |
| Laser Cutting & Sheet Metal | ISO 9013 Class 2 / ISO 2768-c | ±0.15 mm (Cut) / ±0.5 mm (Bend) | Pin Gauges / Protractor Gauge / Optical Comparator |
Dispute Adjudication Matrix: Seller Fault vs. Buyer Fault
All refund and remake disputes lodged during the 7-day inspection window are adjudicated impartially by Wesker's Metrology & Quality Engineering Desk:
| Inspection Finding | Fault Classification | Escrow Resolution | Platform Action |
|---|---|---|---|
| Out of Tolerance (>ISO 2768-mK) or Wrong Material | Seller Fault | 100% Full Refund to Buyer or Free Priority Remake | Shop Quota debited; Seller rating drops by 0.5 stars; ad campaigns paused. |
| Flaws in Buyer CAD (Non-manifold mesh, thin walls <0.8mm) | Buyer Fault | 0% Refund; 100% Net Escrow Released to Seller | Seller fully compensated for machine time and material stock. |
| Refusal to Provide Delivery OTP upon Physical Arrival | Buyer Fault | 0% Refund; Return logistics fee debited from buyer escrow | Seller payout disbursed upon courier GPS and delivery log proof. |
| Transit Impact Damage (Intact packaging seals) | Logistics Carrier | 100% Buyer Refund or Free Expedited Remake | Claim recovered via Wesker Transit Freight Insurance; zero seller penalty. |
Refund Processing SLA & Banking Remittance Rails
Approved refunds are credited directly back to the original source payment instrument via Cashfree Payments with zero hidden processing fees:
Instant to 2 Hours
Direct reversal to the originating UPI handle (VPA) via NPCI instant refund rails.
2 to 4 Banking Days
Remitted directly back to the original issuing bank account via Cashfree Payments nodal gateway.
Bank ARN Provided
An Acquirer Reference Number (ARN) is issued via SMS and email for bank-level tracking.
Statutory Grievance Redressal Desk
If a returns or refund dispute cannot be satisfactorily resolved between the workshop and buyer within 72 hours, it escalates to our designated Grievance Officer appointed under Rule 3(2) of the Information Technology Rules, 2021:
Mr. Vikrant Sharma, Advocate
Chief Grievance Officer & Legal Head
Wesker India Pvt. Ltd. (Emina Technologies),
Cyber Park, Sector 67, Gurugram, Haryana 122102, India
Statutory Version History & Changelog
| Version | Effective Date | Summary of Enacted Returns & Refund Rules | Statutory Basis |
|---|---|---|---|
| 2026.1 | August 20, 2026 | Integrated DPDP Act 2023 purpose-specific consent ledger, explicit 7-day inspection window & escrow refund guarantees under Consumer Protection (E-Commerce) Rules 2020, and automated CAD/AI moderation disclosures under IT Rules 2021. | DPDP Act 2023, CP (E-Commerce) Rules 2020, IT Rules 2021 |
| 2025.2 | November 15, 2025 | Initial Intermediary liability disclosures under Section 79 of IT Act 2000, Grievance Officer appointment, and RBI escrow milestone protections. | IT Act 2000, Section 79, IT Rules 2021 |
Need to file a formal dimensional dispute or talk to our metrology desk?